Project Controls Skill · Free

P6 Earned Value Report

CPI, SPI, and forecasts from your XER file.

Requires the PyP6Xer MCP server

A Claude skill that produces earned value management reports from Primavera P6 XER files. CPI, SPI, cost and schedule variances, forecasts, progress by WBS, and resource utilisation in a format you can present.

The problem

Earned value reporting in P6 means navigating multiple screens, exporting to Excel, and building the report manually. If the XER file does not have costs loaded, you are stuck. Most project teams avoid EVM because the reporting is too painful, not because the method is wrong.

What it does

Features

  • Core EVM metrics: PV, EV, AC, CPI, SPI, CV, SV
  • Forecasts: EAC, VAC, TCPI with plain English interpretation
  • Progress summary: by activity count, by duration (weighted), by physical %
  • Work package breakdown: completion, critical activities, remaining duration per WBS
  • Resource utilisation: allocation, overallocation flags
  • Flags missing cost data and pivots to schedule-only metrics when needed
  • Presentable format: tables and narrative ready for a monthly report

Getting started

Quick start

  1. 1

    Download the skill and drop it into your project

  2. 2

    Connect the PyP6Xer MCP server (instructions included)

  3. 3

    Upload or link any XER file and ask for an earned value report

Data sources

MCP server

PyP6Xer

https://pyp6xer-mcp.fly.dev/mcp

Free download

What's included

  • SKILL.md file for Claude Code, Cursor, or any AI agent
  • Setup guide for connecting the PyP6Xer MCP server
  • EVM metric reference guide
  • Lifetime updates

Who it's for: QS, commercial managers, project controls analysts, programme managers